Deprecated: Optional parameter $default declared before required parameter $emv is implicitly treated as a required parameter in /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php on line 19

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/rest-api/class-wp-rest-server.php on line 1896
{"id":6860,"date":"2025-05-01T09:18:40","date_gmt":"2025-05-01T13:18:40","guid":{"rendered":"https:\/\/schnackel.com\/mls312\/staging\/?p=6860"},"modified":"2025-05-19T11:52:07","modified_gmt":"2025-05-19T15:52:07","slug":"key-challenges-in-expanding-hawaiis-ev-charging-infrastructure","status":"publish","type":"post","link":"https:\/\/schnackel.com\/mls312\/staging\/blogs\/key-challenges-in-expanding-hawaiis-ev-charging-infrastructure","title":{"rendered":"Key Challenges in Expanding Hawaii\u2019s EV Charging Infrastructure\u00a0"},"content":{"rendered":"\n

Hawaii is at the forefront of clean energy adoption, with a statewide goal of reaching 100% renewable energy by 2045. A key part of this vision includes expanding electric vehicle (EV) charging infrastructure to support the growing number of EVs on the road.<\/p>\n\n\n\n

While progress is being made, developing a reliable and accessible EV charging network in Hawaii comes with unique challenges. Factors such as increased electrical demand, limited space, high installation costs, and infrastructure integration can add complexity to both new and existing projects. Understanding these factors\u2014along with the specific requirements of EV charging systems\u2014is essential for making informed decisions and contributing to Hawaii\u2019s clean energy future.<\/p>\n\n\n\n

1. Building Electrical Infrastructure<\/strong><\/h2>\n\n\n\n

Many stakeholders are not fully aware of the scale of electrical upgrades involved in EV charging installations. While adding chargers may appear straightforward, the process is often far more complex\u2014particularly at larger properties where demand can increase significantly.<\/p>\n\n\n\n

EV Charging Systems without Load Management<\/strong><\/h5>\n\n\n\n

The 2020 National Electrical Code (NEC) requires that electric vehicle charging loads not equipped with a load management system must be considered continuous loads, meaning that all circuits, overcurrent protection, and distribution equipment associated with EV charger(s) are required to be sized at 125% of the EV charging load being served.<\/p>\n\n\n\n

Examples:<\/strong><\/u><\/em><\/p>\n\n\n\n