Deprecated: Optional parameter $default declared before required parameter $emv is implicitly treated as a required parameter in /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php on line 19

Warning: Cannot modify header information - headers already sent by (output started at /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php:19) in /home1/schnakel/public_html/mls312/staging/wp-includes/feed-rss2.php on line 8
West Coast Archives | Melissa Test Site Wed, 06 Mar 2024 15:03:22 +0000 en-US hourly 1 https://schnackel.com/mls312/staging/wp-content/uploads/2021/03/se-favicon.ico West Coast Archives | Melissa Test Site 32 32 Kings 838 Apartments https://schnackel.com/mls312/staging/project/kings-838-apartments Thu, 14 Jan 2021 18:29:27 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1721 West Hollywood, CA Schnackel Engineers provided full mechanical, electrical and plumbing design services for the new Kings 838 Apartments located in one of West Hollywood’s fastest developing neighborhoods. Lighting design services was provided via our subsidiary, Light Plan Design. The design focused on sustainability and energy efficiency. The new construction project consists of 25 high-end... Read More

The post Kings 838 Apartments appeared first on Melissa Test Site.

]]>
West Hollywood, CA

Schnackel Engineers provided full mechanical, electrical and plumbing design services for the new Kings 838 Apartments located in one of West Hollywood’s fastest developing neighborhoods. Lighting design services was provided via our subsidiary, Light Plan Design. The design focused on sustainability and energy efficiency. The new construction project consists of 25 high-end multi-family units with one level of underground parking surrounded by an appealing landscape that will complement the design of the building, enhancing the overall streetscape and neighborhood. Completion is slated for summer 2019.

*Renderings courtesy of Darmos Properties

The post Kings 838 Apartments appeared first on Melissa Test Site.

]]>
Downtown Summerlin https://schnackel.com/mls312/staging/project/downtown-summerlin Mon, 11 Jan 2021 19:26:16 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1601 Summerlim, NV This project was a new 2.7 million plus square foot, mixed-use facility featuring Retail, Hospitality, High-Rise Office, Restaurants, Residential, a Paseo with Common Public Areas, and Structured Parking. Part of a 22,500 acre Master-Planned Community, Schnackel Engineers was involved in all phases of the Downtown Summerlin project, including Mechanical, Electrical, Plumbing, Fire Protection,... Read More

The post Downtown Summerlin appeared first on Melissa Test Site.

]]>
Summerlim, NV

This project was a new 2.7 million plus square foot, mixed-use facility featuring Retail, Hospitality, High-Rise Office, Restaurants, Residential, a Paseo with Common Public Areas, and Structured Parking. Part of a 22,500 acre Master-Planned Community, Schnackel Engineers was involved in all phases of the Downtown Summerlin project, including Mechanical, Electrical, Plumbing, Fire Protection, Data Communications, Security, and on-site utility coordination.

Unique design challenges of a project this size were numerous, but of special interest were the challenges of creating an open air lifestyle design in the hot Nevada desert, while incorporating cutting-edge energy and environmental design requirements necessary to have a long term successful project and to obtain LEED Certification. These challenges were met through innovative system controls, aggressive water management and progressive utility strategies.

Downtown Summerlin has attained LEED Silver Certification.

The post Downtown Summerlin appeared first on Melissa Test Site.

]]>
Villa Sport Athletic Club and Spa https://schnackel.com/mls312/staging/project/villa-sport-athletic-club-and-spa Mon, 11 Jan 2021 18:50:00 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1550 Beaverton, OR The first of many Villa Sport locations on which Schnackel Engineers has been engaged, the Beaverton OR location is one of several around the country. This 88,000 square foot club includes both indoor and outdoor pools sports, courts, a cafe and a full service spa. Schnackel’s experience in restaurants and knowledge of local... Read More

The post Villa Sport Athletic Club and Spa appeared first on Melissa Test Site.

]]>
Beaverton, OR

The first of many Villa Sport locations on which Schnackel Engineers has been engaged, the Beaverton OR location is one of several around the country. This 88,000 square foot club includes both indoor and outdoor pools sports, courts, a cafe and a full service spa. Schnackel’s experience in restaurants and knowledge of local codes helped to ease coordination and facilitate an easier design process.

The post Villa Sport Athletic Club and Spa appeared first on Melissa Test Site.

]]>
Mother’s Market and Kitchen https://schnackel.com/mls312/staging/project/mothers-market-and-kitchen Fri, 18 Nov 2022 20:35:22 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=4511 Manhattan Beach, CA Schnackel Engineers has been involved in the design of several Mother’s Market & Kitchen health food stores on the west coast since 2018. Schnackel Engineers provided complete MEP design and energy services for 16,606 square feet of renovated space for Mother’s Market & Kitchen in Manhattan Beach, California, which opened its doors... Read More

The post Mother’s Market and Kitchen appeared first on Melissa Test Site.

]]>
Manhattan Beach, CA

Schnackel Engineers has been involved in the design of several Mother’s Market & Kitchen health food stores on the west coast since 2018.

Schnackel Engineers provided complete MEP design and energy services for 16,606 square feet of renovated space for Mother’s Market & Kitchen in Manhattan Beach, California, which opened its doors in March 2019.

The post Mother’s Market and Kitchen appeared first on Melissa Test Site.

]]>
The University of California – Berkeley Cal Aquatics Center https://schnackel.com/mls312/staging/project/the-university-of-california-berkeley-cal-aquatics-center Mon, 11 Jan 2021 18:36:25 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1530 Berkeley, CA Schnackel Engineers was selected as the MEP Engineering Consultant for the new Cal Aquatics Center at UC Berkeley, where an additional training/recreational pool was needed to relieve demand on existing pool facilities. The new center includes just over 25,000 square feet buildings that will house locker rooms, storage and a multi-purpose building. The... Read More

The post The University of California – Berkeley Cal Aquatics Center appeared first on Melissa Test Site.

]]>
Berkeley, CA

Schnackel Engineers was selected as the MEP Engineering Consultant for the new Cal Aquatics Center at UC Berkeley, where an additional training/recreational pool was needed to relieve demand on existing pool facilities. The new center includes just over 25,000 square feet buildings that will house locker rooms, storage and a multi-purpose building. The facility will have a 50 meter pool and a 10 meter diving platform.

The project is pursuing LEED Silver certification.

The post The University of California – Berkeley Cal Aquatics Center appeared first on Melissa Test Site.

]]>
Uytengsu Aquatics Center of Southern California https://schnackel.com/mls312/staging/project/uytengsu-aquatics-center-of-southern-california Mon, 11 Jan 2021 18:32:13 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1503 Los Angeles, CA This high profile project, designed by ELS Architecture and Urban Design of Berkeley, CA involved the re-design and addition of a new 40,000 square foot aquatics venue and training facility, formerly known as the McDonald’s Aquatics Center on USC’s main campus. The project included a stadium, four training/support buildings and other multi-use... Read More

The post Uytengsu Aquatics Center of Southern California appeared first on Melissa Test Site.

]]>
Los Angeles, CA

This high profile project, designed by ELS Architecture and Urban Design of Berkeley, CA involved the re-design and addition of a new 40,000 square foot aquatics venue and training facility, formerly known as the McDonald’s Aquatics Center on USC’s main campus. The project included a stadium, four training/support buildings and other multi-use amenities for students and spectators alike. Schnackel Engineers was engaged as MEP/FP engineering consultant.

The post Uytengsu Aquatics Center of Southern California appeared first on Melissa Test Site.

]]>
Planet Fitness https://schnackel.com/mls312/staging/project/planet-fitness Fri, 08 Jan 2021 18:43:28 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1497 Schnackel Engineers has completed over 500 fitness and athletic clubs throughout the US since 2000 and has been the select MEP engineer on over 300 Planet Fitness locations nationwide. The scope of each project have ranged from 2,300 sq. ft. to 25,000 sq.ft. of remodeled retail space.

The post Planet Fitness appeared first on Melissa Test Site.

]]>
Schnackel Engineers has completed over 500 fitness and athletic clubs throughout the US since 2000 and has been the select MEP engineer on over 300 Planet Fitness locations nationwide. The scope of each project have ranged from 2,300 sq. ft. to 25,000 sq.ft. of remodeled retail space.

The post Planet Fitness appeared first on Melissa Test Site.

]]>
OpenRoad https://schnackel.com/mls312/staging/project/openroad Fri, 08 Jan 2021 18:03:10 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1484 Bellevue, WA Schnackel Engineers provided MEP design services on the project utilizing the full power of our Artificial Intelligence software, AI for MEP™. Each car manufacturer had very unique requirements that required a great deal of detailed coordination throughout each showroom to achieve the diverse aesthetics required by the brands. Our AI technology’s insertion tools... Read More

The post OpenRoad appeared first on Melissa Test Site.

]]>
Bellevue, WA

Schnackel Engineers provided MEP design services on the project utilizing the full power of our Artificial Intelligence software, AI for MEP™. Each car manufacturer had very unique requirements that required a great deal of detailed coordination throughout each showroom to achieve the diverse aesthetics required by the brands. Our AI technology’s insertion tools allowed for the very efficient definition of the complex needs of the building in a fraction of the time it normally takes using conventional engineering methods.

AI for MEP™ optimized the distribution systems to achieve the minimum construction cost, while providing the most energy efficient, sustainable systems possible. Optimization included the reuse of the existing gas piping systems by increasing the pressure to achieve reuse of the existing materials. AI for MEP™ allowed Schnackel Engineers to zone and circuit the power systems to reduce the amount of circuiting, voltage drop and floor slab cutting required. Overall, the materials and labor used in the construction of the MEP distribution systems were reduced from 10 to 30 percent through AI optimization. What’s more sustainable than using 10 to 30% fewer materials in the construction of the MEP systems, while saving energy over the life of the facility?


“Thank you very much for the excellent work, the comments where light, easily and quickly handled. Much appreciated.” – Kevin J. Cleary, Baylis Architects

The post OpenRoad appeared first on Melissa Test Site.

]]>
Intuit https://schnackel.com/mls312/staging/project/intuit-2 Thu, 07 Jan 2021 19:11:01 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1447 Mountain View, CA The Schnackel team was selected by Callison Architecture as the MEP engineering consultant for this project for Intuit. The scope was a full gut/remodel of a 2-story, 58,000 SF existing building on the Intuit campus in Mountain View, CA. Once again, Schnackel was brought on-board for their aesthetic acumen of the built... Read More

The post Intuit appeared first on Melissa Test Site.

]]>
Mountain View, CA

The Schnackel team was selected by Callison Architecture as the MEP engineering consultant for this project for Intuit. The scope was a full gut/remodel of a 2-story, 58,000 SF existing building on the Intuit campus in Mountain View, CA. Once again, Schnackel was brought on-board for their aesthetic acumen of the built environment, as Intuit wished to remodel and strengthen their brand in this 2-story work space. The HVAC design was of particular note here. The biggest challenge was that existing RTUs were to remain, and the new design had to be completely re-routed. Schnackel’s experience with workspace remodel and restrictive parameters was key to accomplishing Intuit’s and Callison’s goals, and delivering another successful project.

The post Intuit appeared first on Melissa Test Site.

]]>
Retail Design Collaborative Office https://schnackel.com/mls312/staging/project/retail-design-collaborative-office Thu, 07 Jan 2021 19:09:19 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1444 Long Beach, CA It is always an honor to collaborate with our clients on their own personal projects and helping them realize their vision. In 2015, Retail Design Collaborative partnered with us on the remodel of their new headquarters in Long Beach California. The original building was a defunct Nordstrom Rack that was transformed into... Read More

The post Retail Design Collaborative Office appeared first on Melissa Test Site.

]]>
Long Beach, CA

It is always an honor to collaborate with our clients on their own personal projects and helping them realize their vision. In 2015, Retail Design Collaborative partnered with us on the remodel of their new headquarters in Long Beach California. The original building was a defunct Nordstrom Rack that was transformed into 34,000 square feet of creative office space.

Schnackel Engineers integrated numerous sustainability strategies into the design by innovative use of natural daylight and ventilation, lighting controls for energy conservation, low water consumption, and smart material selection that met the requirements of the California Building and Energy Codes. This all resulted in the project being awarded LEED Platinum in 2017.

The post Retail Design Collaborative Office appeared first on Melissa Test Site.

]]>
Westfield Galleria at Roseville https://schnackel.com/mls312/staging/project/westfield-galleria-at-roseville Thu, 07 Jan 2021 18:49:55 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1408 Roseville, CA Schnackel Engineers was also chosen as the MEP/FP engineering services provider for yet another high profile mall expansion and remodel of Westfield Galleria at Roseville. Opening in the Fall of 2008, the addition and remodel of over 430,000 square feet will include enough area to add over 100 new retail stores, restaurants and... Read More

The post Westfield Galleria at Roseville appeared first on Melissa Test Site.

]]>
Roseville, CA

Schnackel Engineers was also chosen as the MEP/FP engineering services provider for yet another high profile mall expansion and remodel of Westfield Galleria at Roseville. Opening in the Fall of 2008, the addition and remodel of over 430,000 square feet will include enough area to add over 100 new retail stores, restaurants and multi-featured common area. The challenge on this project for Schnackel was that two new concourses cut through already existing retail tenant base, joining MEP/FP systems already in place. Extensive coordination with the local utility provider, as well as open lines of communication with the owner proved critical as the project evolved. Our team worked diligently to maintain the existing aesthetic and helped to create a new one in the vibrant, new addition. Let us help you to Realize Your Vision™.

The post Westfield Galleria at Roseville appeared first on Melissa Test Site.

]]>
Bed Bath & Beyond https://schnackel.com/mls312/staging/project/bed-bath-beyond Thu, 07 Jan 2021 18:44:36 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1405 Schnackel Engineers has also been a partner to Bed Bath & Beyond, as well as buybuy BABY since 2002, providing MEP design services for locations in the US and Canada. Because Schnackel Engineers is licensed in all 50 States, the District of Columbia, Puerto Rico and seven provinces in Canada, it makes it easy to... Read More

The post Bed Bath & Beyond appeared first on Melissa Test Site.

]]>
Schnackel Engineers has also been a partner to Bed Bath & Beyond, as well as buybuy BABY since 2002, providing MEP design services for locations in the US and Canada. Because Schnackel Engineers is licensed in all 50 States, the District of Columbia, Puerto Rico and seven provinces in Canada, it makes it easy to coordinate any national rollout program. Coupled with our knowledge of thousands of jurisdictions, our fee structure is competitive in any market.

The post Bed Bath & Beyond appeared first on Melissa Test Site.

]]>
BVLGARI https://schnackel.com/mls312/staging/project/bvlgari Thu, 07 Jan 2021 18:40:55 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1396 Union Square – San Francisco, CA Schnackel Engineers was chosen by Brand+Allen Architects as the MEP Engineering consultant to assist in the design of several high-end retail stores. Among them was BVLGARI’s Flagship store in San Francisco. A great deal of preparation, including a visit to BVLGARI’s headquarters in Rome Italy and the “sister store”... Read More

The post BVLGARI appeared first on Melissa Test Site.

]]>
Union Square – San Francisco, CA

Schnackel Engineers was chosen by Brand+Allen Architects as the MEP Engineering consultant to assist in the design of several high-end retail stores. Among them was BVLGARI’s Flagship store in San Francisco. A great deal of preparation, including a visit to BVLGARI’s headquarters in Rome Italy and the “sister store” in Valencia Spain, was taken to study the Italian crafted millwork and intricate Italian lighting fixtures, and then translating these to U.S. approved components, all the while keeping in compliance with strict U.S. codes and energy efficiency standards. Schnackel Engineers direct dealings with the owner in this case exemplifies our ability to transcend language barriers and foreign standards to deliver a highly complex project within tight time constraints.

The post BVLGARI appeared first on Melissa Test Site.

]]>
JoS. A. Bank Clothiers https://schnackel.com/mls312/staging/project/jos-a-bank-clothiers Thu, 07 Jan 2021 18:29:51 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1390 Since 2002, Schnackel Engineers has been in charge of MEP/FP prototype development and management, as well as National Rollout Consultant for Jos. A. Bank Clothiers in the US. Schnackel has been instrumental in delivering consistent design and project coordination for over 400 locations. Quality, convenience, and efficiency are all a part of our daily promise... Read More

The post JoS. A. Bank Clothiers appeared first on Melissa Test Site.

]]>
Since 2002, Schnackel Engineers has been in charge of MEP/FP prototype development and management, as well as National Rollout Consultant for Jos. A. Bank Clothiers in the US. Schnackel has been instrumental in delivering consistent design and project coordination for over 400 locations. Quality, convenience, and efficiency are all a part of our daily promise to each and every client we serve.

The post JoS. A. Bank Clothiers appeared first on Melissa Test Site.

]]>
Louis Vuitton https://schnackel.com/mls312/staging/project/louis-vuitton Thu, 07 Jan 2021 18:23:45 +0000 https://schnackel.com/mls312/staging/?post_type=project&p=1385 Santa Monica Place, Santa Monica, CA Schnackel Engineers were chosen by the LVMH Group to provide the MEP Engineering services for the design of the Louis Vuitton’s Santa Monica Place location in Santa Monica, CA. Already in a LEED Certified mall, the location was chosen by LVMH as to feature the first Louis Vuitton to... Read More

The post Louis Vuitton appeared first on Melissa Test Site.

]]>
Santa Monica Place, Santa Monica, CA

Schnackel Engineers were chosen by the LVMH Group to provide the MEP Engineering services for the design of the Louis Vuitton’s Santa Monica Place location in Santa Monica, CA. Already in a LEED Certified mall, the location was chosen by LVMH as to feature the first Louis Vuitton to pursue LEED Certification of any kind. One of the challenges that was faced by our team was the extensive building envelope study that was required in order to comply with Louis Vuitton’s visions of their project, while keeping the strict landlord requirements in mind as well. From a sustainability standpoint, the store also utilized innovative lighting technology in order to reduce energy consumption through a new and unique type of ballast. Our experience as a LEED MEP consultant proved invaluable to this haute-couture retailer, and Schnackel’s attention to the aesthetic implications of MEP systems design once again delivered high-end results.

The post Louis Vuitton appeared first on Melissa Test Site.

]]>