Deprecated: Optional parameter $default declared before required parameter $emv is implicitly treated as a required parameter in /home1/schnakel/public_html/mls312/staging/wp-content/plugins/waspthemes-yellow-pencil/base.php on line 19
Cost Control: Reevaluating the Challenges that Derail AEC Budgets | Melissa Test Site
Warning: Undefined array key 0 in /home1/schnakel/public_html/mls312/staging/wp-content/themes/High-Performance-Framework-master/single-library.php on line 27

Cost Control: Reevaluating the Challenges that Derail AEC Budgets


Cost overruns have long been a challenge in the AEC industry.

 Cost Control: Reevaluating the Challenges that Derail AEC Budgets

In this guide, we’ll explore the common factors driving cost overruns, including:

  • Volatile market conditions.
  • Change orders due to misaligned priorities.
  • Wasteful design practices.
  • Misapplication of value engineering.
  • Conflicts between trades in the field.

 

We’ll also identify new strategies for addressing these challenges. With stronger insight into how to address the most common budget-busters, owners and developers can move their next project out to bid with confidence that it can and will achieve their priorities.

Free Download